Our Work

US Army Corps, Wilmington Harbor South, Earthwork
- The US Army Corps of Engineers (USACE) Philadelphia District is responsible to maintain the navigability of the Delaware River from Trenton, NJ to the Delaware Bay.
- Operations and Maintenance include the hydraulic pumping of silted materials from the shipping channel and into various sludge disposal areas along the river.
- The USACE regularly utilizes the de-watered sediments to expand the network of dikes that surround and enclose the disposal areas.
- The JD Bravo Company (Bravo) was selected by the US Army Corps of Engineers (Philadelphia District) to provide earthwork preparation services at three dredge material sites located along the Delaware River from Trenton, NJ to Wilmington, DE. Noteworthy facts regarding these assignments include:
- JDBC assembled a project team which included Haines & Kibblehouse of Philadelphia to complete bulk earthwork prep and ike construction.
- The onsite management successfully planned the assigned work in a highly organized manner, exceeding the expectations of the USACE.
- At Wilmington Harbor South, more than 400,000 cubic yards of material were excavated, trucked, and shaped in 6 months, utilizing 14 pieces of heavy earthmoving equipment.
- The total value of work at all three sites is $8 million.

General Services Administration, James A. Byrne US Courthouse, Air Handling Unit Replacement Pilot Program
Selected by the GSA Region 3 to complete the work of a pilot project to complete 2 of approximately 42 mechanical equipment rooms (MER) of the Byrne Courthouse after the original contractor failed to complete this work. The aforementioned MERs are original to the facility and provide all heating and cooling to operate the building. Noteworthy facts include:
- Project duties included the assumption of complete Design-Build responsibilities.
- Scope of work included a complete assessment of incomplete work, inventory of uninstalled equipment and supplies, as well as a complete review of previous engineering documents.
- JDBC assembled a team that included SDA Mechanical Services and Integrated Facility Solutions as engineers.
- Scope of work included installation and operation of Government supplied temporary equipment.
- JDBC developed an aggressive schedule to complete MER 22N on a fully occupied floor and achieved substantial completion in approximately 12 weeks.
- The project was fully commissioned and completed within 4 weeks of substantial completion.
- Project completed without disturbance to tenants.
- Project completed without claims and minimal change orders.

GSA, William J. Nealon Federal Building, Hvac Modifications & Re-roof
- Selected by the GSA Region 3 to complete a bid-build replacement of three cooling towers and a design-build for the replacement of the building’s condenser water piping and a design-build roof replacement of the cooling tower area roof.
- Bravo assembled a team of mechanical subcontractors, engineers, and various trades to work with the GSA field personnel and regional team to complete this challenging project.Notable features of this project include:
- The historic designation of the Nealon US Courthouse created significant challenges in the establishment and design and installation of new condenser water piping.
- By special request of the GSA, the mechanical portion of this project is expected to be delivered three months ahead of schedule in time to support the 2020 cooling season.
- The project is anticipated to be completed within its $1.85 million contract price.

GSA, EDWARD N. CAHN US COURTHOUSE AND FEDERAL BUILDING,
ROOF REPLACEMENT
- Selected by the GSA Region 3 to complete the installation of a new EPDM roof of approximately 22,000 square feet. Included within the scope of work was a new personnel tieback system on the roof’s perimeter
- Bravo assembled a project team that included Professional Commercial Roofing of Warrington, PA., and Edge Fall Protection of Minneapolis, MN.
Notable features of this project include:
- JDBC completed a highly detailed cost-benefit analysis of the specified “cabled” personnel protection system. The analysis revealed the possibility of providing OSHA-compliant personnel protection at significant savings to the Government through the elimination of over 40 structurally attached roof anchors.
- JDBC provided a voluntary contractor alternate to provide an architecturally designed, weighted railing system. This alternate was offered as a Design-Build package and resulted in savings of $500,000.00 to the Government.
- The existing ballasted roof system was vacuumed from the roof during evenings and weekends.
- An exterior hoist was erected for personnel and material transfers – virtually eliminating the need for through-building access.
- The project was completed approximately three months ahead of schedule at a cost of $1.14 million.


GSA, Edward N. Cahn US Courthouse and Federal Building, Chiller, Cooling Tower, & Pump Replacement
- Selected by the GSA Region 3 to complete the installation of a new cooling tower and a one-for-one chiller replacement with all associated pumps and piping.
Notable features of this project include:
- All work occurred while the courthouse was fully occupied.
- Chiller replacement work consisted of the installation of a Daiken magnetic bearing, high-efficiency unit.
- Associated work included major piping and valve replacement, re-configuration of mechanical roof ductwork, and installation of new refrigeration venting.
- Cooling tower replacement included design and installation of new rooftop ductwork extensions for building exhaust and fresh air intakes to correct original building design deficiencies.
- Project completed in April 2020.
- Project completed within a $1.0 million budget.

Herman T. Schneebeli Federal Building, Fire Alarm And Fire Sprinkler Redesign
- Selected by the GSA Region 3 to complete the installation of a new fire sprinkler and fire alarm system along with corrective fire-stopping work at the existing four-story Schneebeli Federal Courthouse building.
- The Bravo Construction Team completed an extensive survey of the existing building and interstitial spaces to provide the design of the sprinkler system and fire alarm system compatible with existing conditions. The Team included independent engineering support to supplement the services of the GSA’s EOR and to provide independent expertise in the resolution of issues caused by concealed conditions.
Notable features of this project include:
- Work was completed while ongoing Justice, Social Security, FBI, Federal Marshal, and other Federal tenant operations continued in the building.
- Throughout construction, Bravo provided a number of engineered, alternative designs to resolve fire-stopping issues encountered to assure compliance with code and NFPA standards.
- Bravo provided constant coordination and communication with tenants as work progressed throughout the building to supplement the efforts of the Building Manager.
- Completed within its $2.575 million contract price.


Herman T. Schneebeli Federal building and US Courthouse, Cooling Tower and Chiller Replacement
- Selected to complete a bid-build replacement and system upgrade of the existing chiller water plant with new chillers, new pumps, remote chiller water barrels, and suction accumulators
- Work also included new structural support of penthouse roof and floor for new equipment, total replacement of penthouse roof, and installation of new roof fall protection system.
- Urban location and limited space within the penthouse created logistical challenges in equipment placement and redesign spearheaded by JDBC for location support and stacking of major equipment.
- All work is completed without interruption to ongoing operations.
Notable features of this project include:
- Limited crane access and location for hoisting.
- Placement of exterior lift for leading manpower and materials.
- Project completed in April 2020.
- Project completed within a $1.9 million budget.

Robert Nix Federal Courthouse Chiller Replacement
- Selected by the GSA Region 3 to complete a bid-build replacement of four existing centrifugal chillers with three new high-efficiency chillers and related piping, pumps, and accessories
- Bravo assembled a highly competent team to complete the construction of this logistically challenging project.
- Notable features of this project include:
- Challenging logistics as the chiller plant is located 30 feet below street level without elevator or vehicle ramp access.
- All materials and equipment were delivered in component pieces and winched through overhead hatchways below to the mechanical room. Access to subbasement was so severely limited that mock-ups of larger equipment were constructed and test-loaded in simulation to verify the viability of use.
- All work occurred while the courthouse was occupied.
- Project completed in April 2020.
- Project completed within a $1.9 million budget.